首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   29篇
  免费   4篇
  2019年   2篇
  2017年   1篇
  2014年   5篇
  2013年   3篇
  2012年   2篇
  2009年   2篇
  2008年   1篇
  2007年   1篇
  2005年   3篇
  2004年   3篇
  2003年   1篇
  2002年   4篇
  2001年   1篇
  2000年   2篇
  1999年   2篇
排序方式: 共有33条查询结果,搜索用时 15 毫秒
1.
We consider the problem of sequencing n jobs on a single machine, with each job having a processing time and a common due date. The common due date is assumed to be so large that all jobs can complete by the due date. It is known that there is an O(n log n)‐time algorithm for finding a schedule with minimum total earliness and tardiness. In this article, we consider finding a schedule with dual criteria. The primary goal is to minimize the total earliness and tardiness. The secondary goals are to minimize: (1) the maximum earliness and tardiness; (2) the sum of the maximum of the squares of earliness and tardiness; (3) the sum of the squares of earliness and tardiness. For the first two criteria, we show that the problems are NP‐hard and we give a fully polynomial time approximation scheme for both of them. For the last two criteria, we show that the ratio of the worst schedule versus the best schedule is no more than . © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 422–431, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10020  相似文献   
2.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs to be processed and his own objective function, and both share a common processor. In the single‐machine problem studied in this article, the goal is to find a joint schedule that minimizes the total deviation of the job completion times of the first agent from a common due‐date, subject to an upper bound on the maximum deviation of job completion times of the second agent. The problem is shown to be NP‐hard even for a nonrestrictive due‐date, and a pseudopolynomial dynamic program is introduced and tested numerically. For the case of a restrictive due‐date (a sufficiently small due‐date that may restrict the number of early jobs), a faster pseudopolynomial dynamic program is presented. We also study the multiagent case, which is proved to be strongly NP‐hard. A simple heuristic for this case is introduced, which is tested numerically against a lower bound, obtained by extending the dynamic programming algorithm. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 1–16, 2014  相似文献   
3.
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding), and intermediate (work‐in‐process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two different, but closely related, Dantzig‐Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig‐Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two different lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near‐optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with different types of strongly ????‐hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near‐optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
4.
An age‐dependent repair model is proposed. The notion of the “calendar age” of the product and the degree of repair are used to define the virtual age of the product. The virtual failure rate function and the virtual hazard function related to the lifetime of the product are discussed. Under a nonhomogeneous Poisson process scenario the expected warranty costs for repairable products associated with linear pro‐rata, nonrenewing free replacement and renewing free replacement warranties are evaluated. Illustration of the results is given by numerical and graphical examples. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
5.
In this paper, we present an optimization model for coordinating inventory and transportation decisions at an outbound distribution warehouse that serves a group of customers located in a given market area. For the practical problems which motivated this paper, the warehouse is operated by a third party logistics provider. However, the models developed here may be applicable in a more general context where outbound distribution is managed by another supply chain member, e.g., a manufacturer. We consider the case where the aggregate demand of the market area is constant and known per period (e.g., per day). Under an immediate delivery policy, an outbound shipment is released each time a demand is realized (e.g., on a daily basis). On the other hand, if these shipments are consolidated over time, then larger (hence more economical) outbound freight quantities can be dispatched. In this case, the physical inventory requirements at the third party warehouse (TPW) are determined by the consolidated freight quantities. Thus, stock replenishment and outbound shipment release policies should be coordinated. By optimizing inventory and freight consolidation decisions simultaneously, we compute the parameters of an integrated inventory/outbound transportation policy. These parameters determine: (i) how often to dispatch a truck so that transportation scale economies are realized and timely delivery requirements are met, and (ii) how often, and in what quantities, the stock should be replenished at the TPW. We prove that the optimal shipment release timing policy is nonstationary, and we present algorithms for computing the policy parameters for both the uncapacitated and finite cargo capacity problems. The model presented in this study is considerably different from the existing inventory/transportation models in the literature. The classical inventory literature assumes that demands should be satisfied as they arrive so that outbound shipment costs are sunk costs, or else these costs are covered by the customer. Hence, the classical literature does not model outbound transportation costs. However, if a freight consolidation policy is in place then the outbound transportation costs can no longer be ignored in optimization. Relying on this observation, this paper models outbound transportation costs, freight consolidation decisions, and cargo capacity constraints explicitly. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 531–556, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10030  相似文献   
6.
In this paper, a single‐machine scheduling problem with weighted earliness and tardiness penalties is considered. Idle time between two adjacent jobs is permitted and due dates of jobs could be unequal. The dominance rules are utilized to develop a relationship matrix, which allows a branch‐and‐bound algorithm to eliminate a high percentage of infeasible solutions. After combining this matrix with a branching strategy, a procedure to solve the problem is proposed. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 760–780, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10039  相似文献   
7.
在有交易费模型下,初步讨论了未定权益的公平价的定义形式和基本性质,并给出了基于无套利分析的公平价结果。  相似文献   
8.
This article compares the profitability of two pervasively adopted return policies—money‐back guarantee and hassle‐free policies. In our model, a seller sells to consumers with heterogeneous valuations and hassle costs. Products are subject to quality risk, and product misfit can only be observed post‐purchase. While the hassle‐free policy is cost advantageous from the seller's viewpoint, a money‐back guarantee allows the seller to fine‐tune the consumer hassle on returning the product. Thus, when the two return policies lead to the same consumer behaviors, the hassle‐free policy dominates. Conversely, a money‐back guarantee can be more profitable even if on average, high‐valuation consumers experience a lower hassle cost than the low‐valuation ones. The optimal hassle cost can be higher when product quality gets improved; thus, it is not necessarily a perfect proxy or signal of the seller's quality. We further allow the seller to adopt a mixture of these policies, and identify the concrete operating regimes within which these return policies are optimal among more flexible policies. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 403–417, 2014  相似文献   
9.
目前航空装备的保障普遍存在保障费用高和装备可用度低的问题。针对视情维修(Condition-based Maintenance,简称CBM)在新一代航空装备中的应用,以保证航空装备的战备完好性,降低维修保障费用为目标,应用系统动力学原理,建立基于视情维修的航空装备保障费用的动态反馈结构模型。仿真结果表明,将视情维修方法应用到航空装备保障,可有效降低保障费用,提高战备完好率。  相似文献   
10.
武器装备全寿命费用宏观控制的系统动力学模型   总被引:1,自引:1,他引:0       下载免费PDF全文
以武器装备作战能力差距为牵引,以全寿命周期阶段对作战能力的影响为主要依据,建立了基于系统动力学的武器装备全寿命费用控制分析模型,客观、合理地描述了全寿命周期各阶段之间的相互影响,并对武器装备全寿命费用宏观费用控制问题进行了仿真实验分析。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号